TECHNICAL AND ENVIRONMENTAL STUDY OF TAL BARAT’S SETTLING POND PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM MINING UNIT SUMATERA SELATAN

-

Authors

  • Dhea Annisa Puteri PT Bukit Asam Tbk, Tanjung Enim, Suamtera Selatan

DOI:

https://doi.org/10.36706/jmse.v10i1.87

Keywords:

mine plan

Abstract

TAL Barat’s runoff comes from TAL Barat and MT4’s sump. Area of MT4’s sump will be done mining extention cause there’s coal reserves so it needs sump drying. It’ve an impact on settling pond. So it needs to conduct technical and environmental study to overcome problems, where data taken, processed, and analysed in location with survey method and laboratory test. Result’re the difference characteristics of both sump which will be flowed towards the one settling pond. It’ll give technical effects increasing runoff to settling pond that would exceed current capacity and environment effects, there’s a change in pH, TSS, Fe and Mn. Plan debit and pump time of TAL Barat’s sump’re 480 m3/h and 5 h/day and MT4’s sump’re 972 m3/h and 21 h/day. Plan’s runoff to settling pond is 38.514 m3/day. Plan compartment’re 7 compartement. Plan of sedimentation time to be 2-3 times higher than actual. Related environment’s aspect, water quality test of TAL Barat’s inlet(1) and MT4’s inlet(2)’re average pH1=4.9133, pH2=3,8333, TSS1=398,3333 mg/L, TSS2=202,6667 mg/l, Fe1=4,6355 mg/l, Fe2=5,0191 mg/l, Mn1=7,8172 mg/l, Mn2=7,9234 mg/l. Outlet’re average pH=5,8283, TSS=119 mg/l, Fe=4,6815 mg/l, Mn=7,5966 mg/l. It’ll be concluded pH and Mn haven’t fulfilled quality standard. Active treatment’s performed to increase pH=5,83 to 6 by adding dose of lime 53,08 kg. Passive treatment’s performed to reduce metal by plant 6.348 Kiambang,86.017 Akar Wangi,20.933 Eceng Gondok dan 21.504 Lembang.

Downloads

Download data is not yet available.

References

Kementrian LH. (2003). Peraturan Menteri Negara Lingkungan Hidup Nomor 113 Tahun 2003 tentang Baku Mutu Limbah Bagi Usaha dan

atau Kegiatan Pertambangan Batubara. Jakarta: Kementrian Lingkungan Hidup.

Gubernur SumSel. (2012). Peraturan Gubernur Sumatera Selatan Nomor 8 Tahun 2012 Tentang Baku Mutu Limbah Cair Pertambangan

Batubara. Palembang: Gubernur Sumsel.

Skousen, J.G.; Sextone, A.; Ziemkiewiez, P.F. (2000). Acid Mine Drainage Control And Treatment. Chapter 6. In: Reclamation of Drastically

Disturbed Lands American Society of Argonomy, Crop Science Society of America, Soil Science Society of Amerika, 677 S. Segoe Rd.,

Madison, WI 53711. USA. Agronomy Monograph no. 41.

Suwandhi, A. (2004). Perencanaan Sistem Penyaliran Tambang. Bandung: UNISBA.

Suripin. (2004). Sistem Drainase Perkotaan yang Berkelanjutan. Yogyakarta: ANDI.

Tahara, H. (2004). Pompa dan Kompresor. Jakarta : PT. Pradnya Paramitha.

Sularso dan Tahara, H. (2000). Pompa dan Kompesor (Pemilihan, Pemakaian dan Pemeliharaan). Jakarta: Pramidya Paramita.

Harfani, E. Y. (2007). Evaluasi Pengelolaan Lingkungan PT. Bukit Baiduri Energi Di Kalimantan Timur. Tesis. Semarang: Universitas Diponegoro.

Seyhan, E. (1990). Dasar-dasar Hidrologi. Yogyakarta: Gadjah Mada University Press.

Endrianto dan Ramli, M . (2013). Perencanaan Sistem Penyaliran Tambang Terbuka Batubara pada Pit Seam 11 Selatan PT Kitadin Tandung

Mayang. Jurnal Geosains, 9(1), 1-7.

Downloads

Published

2023-05-17

How to Cite

Puteri, D. A. (2023). TECHNICAL AND ENVIRONMENTAL STUDY OF TAL BARAT’S SETTLING POND PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM MINING UNIT SUMATERA SELATAN: -. Journal of Mechanical Science and Engineering, 10(1), 019–025. https://doi.org/10.36706/jmse.v10i1.87